MGM HAS FULL TECHNICAL CAPABILITIES AND EXPERIENCE TO CARRY OUT ENGINEERING AND DESIGN ACTIVITIES FOR:


• Combined and Open Cycle Power Plants;
• Conventional Thermoelectric Power Plants;
• Re-powering and Rehabilitation of existing Units;
• Flexibilization of power plants to meet electricity market needs;
• Cogeneration/Trigeneration Power Plants, gas turbine or engine based, natural gas, syngas or liquid fuelled;
• Biomass and Biogas Power Plants;
• Waste-to-Energy Plants;
• Small Hydro Power Plants;
• Photovoltaic Systems;
• Wind Farms;
• Power Transmission and Distribution Systems;
• Industrial and District Heating and Cooling Systems;
• Fuel Handling and Treatment Units;
• Fuel Storage Facilities;
• Gas Compression, Metering and Reducing Stations.


MGM expertise spans a wide range of technologies and plant sizes and includes revamping and repowering of existing plants.

The Italian Energy Authority (AEEG) enrolled MGM as an “ESCO”, Energy Service Company, able to supply energy saving services through increased efficiency projects, realized for End Users benefit. MGM is therefore authorized to enter the Energy Efficiency Certificates (White Certificates) market.

COMPANY NEWS

June, 2010

Condensing System For Waste To Energy
ACSM-AGAM of Como successfully completed the final performance tests of the new surface steam condensing system designed by MGM, operated in parallel with the existing air condensing system, for their 20 MW waste-to-energy plant in Como.
MGM scope, completed in 2009, was a full Owner Engineering project including procurement assistance and field management.


May, 2010

Energy Management
Organizations are increasingly under pressure from energy regulations, decreasing their margins.
The importance of Energy Management has significantly increased MGM services by ensuring regulatory compliance and efficient management of environmental resources.


April, 2010

Enhanced Biomass Cogeneration Plant
LINEA ENERGIA awarded MGM the feasibility, basic design and full authorizations for a new 1 MW waste-to-energy plant to be installed in Cremona.
Fuel is wood deriving from their separate waste collection system.
The plant will be granted a flat tariff of 280 € MW/h for 15 years according to Italian rules for renewable energies.