MGM&C


Go to content

Offices

Company

OFFICES:

Offices are equipped with an Information Technology System, ruled by an external skilled engineer, based on the most updated tools
(a domain supported by Windows 2003 Server Enterprise and Exchange 2003 Enterprise, on a powerful HP server system with full redundant power supply and system RAID 10 disk array of 1,8 Terabyte capacity, and Windows XP Pro operative system as clients, full back-up) and well known software worldwide used (MS Office Pack, AutoCAD, MS Project, etc).
Technical staff is supported by process simulators and design and calculation programs for top engineering aid.

Offices, two floors for a total of 280 sq.m, are placed in the "Centro direzionale" area of Milan, easily accessed:


• by Railway Central and Garibaldi stations
• by Metro 2 (Green Line) Gioia and Centrale stations and Metro 3 (Yellow Line) Sondrio, Centrale and Repubblica Stations
• by Bus Station for Milano Linate, Malpensa and Orio al Serio airports

COMPANY NEWS

November, 2010

Seventh year of operations
MGM announces the completion of its 7th year of operation continuing the business in strict cooperation with ENER-G Group of Manchester (UK).


October, 2010

ISO 9001:2008 renewal
On October 12th CISQ/CERTIQUALITY renewed the MGM ISO 9001:2000 Quality System certification in accordance with revised ISO 9001: 2008 for the following activities:
Engineering services for the design, the acquisition management of materials and services, the assignment of contracts for the realization of industrial plants.


September, 2010

Energy Management
Organizations are increasingly under pressure from energy regulations, decreasing their margins.
The importance of Energy Management has significantly increased MGM services by ensuring regulatory compliance and efficient management of environmental resources.


July, 2010

Flexibilization of Combined Cycle Power Plants
EDISON awarded MGM the “Flexibilization” project for their 140 MW Combined Cycle Power Plant located in Jesi.
This is the fourth similar project which MGM is working on, underlining again the reliability of MGM design for such “market proof” challenging jobs.


June, 2010

Condensing System For Waste To Energy
ACSM-AGAM of Como successfully completed the final performance tests of the new surface steam condensing system designed by MGM, operated in parallel with the existing air condensing system, for their 20 MW waste-to-energy plant in Como.
MGM scope, completed in 2009, was a full Owner Engineering project including procurement assistance and field management.



Back to content | Back to main menu