Company top management is fully involved in the Operations as Project or Proposal Manager, Procurement and Administration. Skilled Project Managers and technical personnel are assigned to each project, balancing the permanent staff with external resources.


Permanent staff, in accordance with different labour contracts as per Italian law, is presently based on 21 people (CVs are available for reference), out of which :

3 Process
12 Engineering & Design
1 Project Control
1 Quality & Safety
1 Environment & Permits
1 Information Technology
2 Commercial & Administration

Engineering & Design Dept. breakdown is :

1 Dept. Management
2 Equipment & Package
4 Layout & Piping
2 Electrical
1 Instrumentation & Control
2 Civil & Structural

COMPANY NEWS

June, 2010

Condensing System For Waste To Energy
ACSM-AGAM of Como successfully completed the final performance tests of the new surface steam condensing system designed by MGM, operated in parallel with the existing air condensing system, for their 20 MW waste-to-energy plant in Como.
MGM scope, completed in 2009, was a full Owner Engineering project including procurement assistance and field management.


May, 2010

Energy Management
Organizations are increasingly under pressure from energy regulations, decreasing their margins.
The importance of Energy Management has significantly increased MGM services by ensuring regulatory compliance and efficient management of environmental resources.


April, 2010

Enhanced Biomass Cogeneration Plant
LINEA ENERGIA awarded MGM the feasibility, basic design and full authorizations for a new 1 MW waste-to-energy plant to be installed in Cremona.
Fuel is wood deriving from their separate waste collection system.
The plant will be granted a flat tariff of 280 € MW/h for 15 years according to Italian rules for renewable energies.