MGM SCOPE OF SUPPLY INCLUDES, INTEGRATED OR SEPARATELY, THE FOLLOWING SERVICES:


• Technical and Economical Feasibility Studies;
• Investment Cost Definition;
• Owner Engineering;
• Conceptual and Basic Design;
• Front-End Engineering;
• Detailed Engineering, including all related Technical Disciplines (through well proven outsourcing when necessary);
• Design Review;
• Procurement services, including Purchasing, Sub-Contracting, Expediting, Inspection and Logistics;
• Tender Evaluation, Technical Negotiation and Contract Preparation;
• Field Management, including Technical Supervision and Testing;
• Plant Commissioning and Start-Up, including Training of Operation Personnel;
• Project Management, Planning and Cost Control;
• Proposal Management and Bid Document Preparation;
• Energy Audits and Services;
• Project Due Diligences;
• Environmental Permits, Legal Authorizations and Building Certifications;


Scope also includes the supply of materials, equipment and plants on partial or turn-key based jobs, according to Customer requirements and financial strategies.
MGM can supply skid mounted systems through a permanent agreement with a workshop equipped with updated facilities for fabrication, assembling, testing, loading and warehousing.

COMPANY NEWS

June, 2010

Condensing System For Waste To Energy
ACSM-AGAM of Como successfully completed the final performance tests of the new surface steam condensing system designed by MGM, operated in parallel with the existing air condensing system, for their 20 MW waste-to-energy plant in Como.
MGM scope, completed in 2009, was a full Owner Engineering project including procurement assistance and field management.


May, 2010

Energy Management
Organizations are increasingly under pressure from energy regulations, decreasing their margins.
The importance of Energy Management has significantly increased MGM services by ensuring regulatory compliance and efficient management of environmental resources.


April, 2010

Enhanced Biomass Cogeneration Plant
LINEA ENERGIA awarded MGM the feasibility, basic design and full authorizations for a new 1 MW waste-to-energy plant to be installed in Cremona.
Fuel is wood deriving from their separate waste collection system.
The plant will be granted a flat tariff of 280 € MW/h for 15 years according to Italian rules for renewable energies.